Technical Summary of Research into
Unit Power Density and Unit Uplight Density
by
David M. Keith
Table of Contents
Table of Tables
Table of Figures
Introduction
Unit Power Density (UPD)
Unit Uplight Density (UUD)
Research Scope
Procedure
Calculation Procedure: Overview
Calculation Procedure: One
Calculation Procedure: Two
Initial, Incremental and Final Values for Optimization Procedure
Design Criteria
Luminaire and Lamp Data
Photometric Files
Roadway and Area Classifications, Roadway Widths and Surface
Calculations
Calculations: Different Phases
Calculations: Illuminance and Luminance
Calculations: Zero Overhang
Calculations: HPS LLF
Calculations: Major High
Calculations: UPD and UUD
Calculations: Groups, "Top 5" and "Top 10"
Results
Results: Optimization, UPD and UUD
Results: Design Criteria
Results: Illuminance and Luminance
Results: Cutoff Classifications
Conclusions
References
Table of Tables
Table 1: Criteria from ANSI/IESNA RP-8-00
Table 2: Luminaire and Lamp Data
Table 3: Photometric Files, Preliminary
Table 4: Photometric Files, Intermediate and Advanced
Table 5: Photometric Files for Uplight Calculations, Intermediate and Advanced
Table 6: Roadway and Lamp Wattage Matrix
Table 7: Counts of Luminaires, Groups and Runs for Unit Power Density (UPD) Calculations
Table 8: Counts of Luminaires, Groups and Runs for Unit Uplight Density (UUD) Calculations
Table 9: Preliminary Phase Results Summary for Systems with Lowest UPD Values
Table 10: Averaged "Top 5" UPD Values For "Any Distribution Allowed"
Table 11: Averaged "Top 5" UPD Values For "Full Cutoff Only"
Table of Figures
Figure 1: Lavg, STV and UUD values by UPD values for Different Photometric Files
Figure 2: Preliminary Phase UUD and UPD values for Collector 3 lane road with 250W HPS
Figure 3: UPD and Average Luminance for Collector Two Lane with 250 HPS (C07s250H)
Figure 4: UPD and Average Luminance for Collector Two Lane with 250 MH (C07s250M)
Figure 5: Intermediate Phase Results for Both, Illuminance & Luminance, Coll. 2 lanes 250W MH
Figure 6: Intermediate Phase Results for Both, Illuminance & Luminance, Major 6 lanes 250W MH
Figure 7: Percentage Differences in "Top 5" UPD from "Any Distribution Allowed" to "Full Cutoff Only"
to Alliance for Lighting Information
to Marshall Design, Inc.
This page is served & maintained by &
last changed on 28 Apr 03 by